Monday, May 13, 2019

TRIBOROUGH BRIDGE PROJECT (NY) Essay Example | Topics and Well Written Essays - 250 words

TRIBOROUGH BRIDGE PROJECT (NY) - Essay ExampleConstruction of the tie commenced in 1929. The total cost of constructing the twain was announced to be more than $60 million, exceeding that of the hoover Dam. The bridge was officially opened on July 11, 1936.Triborough Bridge Project is officially referred to as Robert F. Kennedy Bridge. The bridge carries 8 lanes of 278 I-278 and 6 lanes of NY 900G. The bridge is designed as a suspension, lift and truss bridge. The total length of the bridge comprises of three spans 2,780 feet, 770 feet and 1,600 feet through Queens, Manhattan, and Bronx respectively. Constructors used both hand tools and specialised tools and equipment for constructing the complex bridge. Similarly, both specialised engineers and unenlightened manpower was critical for the project completion. Among the methods that were used for constructing the bridge include balanced cantilever, incremental launching, advanced shoring, and threatening lifting. If the bridge wa s to be built, the constructors would consider building the roofing for protecting pedestrians and cyclists from hot sunshine and

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.